In the Annex, the project plan starts with the building. A condo kitchen brings property management into the schedule. An older house may need structural work to make a changed layout possible.
Explore renovation servicesRequest your consultation

Plan changes to the unit around the building’s requirements for moving materials, booking elevators and protecting shared hallways.

Plan changes to room layouts, wiring and plumbing together when renovating an older house. Decide which original features to keep before drawing new partitions.

Fit storage, work surfaces and task lighting into a narrow kitchen. In a condo, check building rules before moving appliances or venting a range hood.

Rework an awkward bathroom around the drain and exhaust route. A wall-hung vanity or a roomier shower can change how you use the space.

Assess the foundation walls, stair headroom and ceiling height before planning finished rooms in an older house.


The Annex has many Victorian and Edwardian houses, including the Annex style that blends Romanesque Revival and Queen Anne details, on narrow lots close together. Brick, stone, woodwork and shared walls are part of the appeal. They also decide what can change, how the work is reached and who has to be consulted.
We work through these items with you and your design team during pre-construction, so the drawings, budget and schedule reflect them from the start.
We review the building’s renovation requirements with property management, including approval documents, permitted work hours and elevator reservations. Those details shape when trades can work, when materials can arrive and how debris leaves the building.
Before reconfiguring rooms, identify the original features you want to keep and confirm which walls carry loads. A kitchen renovation is a good time to check whether nearby wiring and plumbing should be updated as part of the scope.
The City’s heritage districts in the Annex have their own plans describing what can change on the street side of a house. Work such as new windows, porch repairs, masonry repointing or a rear addition may need heritage review before a building permit. Confirm your property’s status first, so you can decide how much to repair, how much to replace and how an addition should sit behind the original house.
Many older houses have low basement ceilings. Underpinning lowers the floor by extending the foundation walls deeper, which is noisy, messy and sequenced carefully, especially beside a shared wall. Where the lot and zoning allow it, a laneway or garden suite is another way to add living space. Compare both against your lot before design starts.
Most decisions about cost, approvals and schedule are made before construction starts. In the Annex that includes heritage review, party-wall protection and how materials will reach a tight site.
We review the house, the lot and what you want to change, then work through drawings, approvals, selections and a detailed quote. Any change is priced in writing and approved by you before the work starts.
We coordinate trades, inspections and deliveries, protect the parts of the house and property that stay, and keep you informed about progress, upcoming decisions and anything that affects the schedule.
We walk through the finished work with you, close out any outstanding items and explain how the warranty works once you have moved back in.
Prefer to call? (416) 876-1052 · Mon–Fri 9–5, Sat 10–4