Start with how you use the house today. A more connected kitchen and dining area, a better entrance or a quieter upstairs layout can change how the whole home works.
Explore renovation servicesRequest your consultation

Coordinate a main-floor renovation with work upstairs. Sort out which rooms need to move and where new wiring or ductwork will run.

Connect cooking, dining and the route to the back door. Plan pantry storage and island seating around the paths people use at dinner time.

Refresh a family bathroom with a tub or walk-in shower, an easy-to-clean floor and enough vanity storage for everyone using it.

Create a playroom, office or laundry area downstairs. Plan access to the furnace and storage around the space you want to finish.


Much of Leaside’s housing was built in the early to mid twentieth century, and many lots are modest in size, with semi-detached houses sitting alongside detached ones. That mix affects how far a project can go, how it is built next to a neighbour and what the City needs to see before work starts.
We work through these items with you and your design team during pre-construction, so the drawings, budget and schedule reflect them from the start.
Decide where you need more room for cooking, storage and everyday traffic. If the plan opens a wall between rooms, confirm how the wall is supported and where plumbing or ducts run before settling the layout.
If the existing layout can’t fit the rooms you need, compare a rear extension with building upward. Each option affects how much of the yard you keep and how much work the existing house needs.
A low basement ceiling can be improved by underpinning, which lowers the floor and deepens the foundation walls, or by working within the existing height. Underpinning needs a structural engineer, a building permit and care for the neighbouring foundation, which matters most on a semi-detached house. It is also messier and more disruptive than finishing at the existing height. Compare the added headroom with the added scope before you decide.
If you own a condo in a nearby building, the building’s renovation rules shape the schedule: approval documents, permitted work hours, elevator bookings and where materials can be delivered. We review them with property management before the work is planned.
Most decisions about cost, approvals and schedule are made before construction starts. In Leaside that often includes the neighbour on the other side of a shared wall, variances and how the basement and foundation will be handled.
We review the house, the lot and what you want to change, then work through drawings, approvals, selections and a detailed quote. Any change is priced in writing and approved by you before the work starts.
We coordinate trades, inspections and deliveries, protect the parts of the house and property that stay, and keep you informed about progress, upcoming decisions and anything that affects the schedule.
We walk through the finished work with you, close out any outstanding items and explain how the warranty works once you have moved back in.
Prefer to call? (416) 876-1052 · Mon–Fri 9–5, Sat 10–4