Start with how the house sits on its lot. On a sloped property, access for construction, drainage and the level of the main floor can affect what you can change.
Explore renovation servicesRequest your consultation

Plan interior changes around how you enter the house from the street and yard. If the work touches exterior steps or doors, review access before finalizing the layout.

Use the windows and existing openings to guide the cabinet plan. Check that an island or taller cabinets leave a clear route to the dining area.

Compare a shower or vanity update in the current layout with moving fixtures. Check where drains can pass through the floor before choosing a layout.

On a sloped lot, check where water goes after heavy rain and whether you see damp walls indoors. Use those findings to plan the finishing work.

Moore Park sits among ravines, a large cemetery and a rail corridor, and many of its houses date from the early twentieth century. English Cottage, Georgian and Tudor-style designs are common. Updating one of these homes usually means deciding what to keep, how new work will read from the street, and which rules apply to your particular lot.
We work through these items with you and your design team during pre-construction, so the drawings, budget and schedule reflect them from the start.
Walk the route from the street to the work area early. Decide where materials can be staged and whether the scope touches exterior steps, grading or drainage.
Check floor framing and the plumbing route before moving a shower or adding a second sink. You can then compare an update within the existing footprint with a larger layout change.
When a family needs more room, the choice is often between adding a floor and building out the back. A second- or third-storey addition keeps the yard but changes the roofline, so it is the most visible from the street and needs the closest look at zoning height limits. A rear or side addition leaves the front of the house as it is, but it uses garden space and may sit closer to trees. Compare both against your lot before design starts.
Most decisions about cost, approvals and schedule are made before construction starts. In Moore Park that often includes what to keep in an older house, variances and any ravine or tree requirements.
We review the house, the lot and what you want to change, then work through drawings, approvals, selections and a detailed quote. Any change is priced in writing and approved by you before the work starts.
We coordinate trades, inspections and deliveries, protect the parts of the house and property that stay, and keep you informed about progress, upcoming decisions and anything that affects the schedule.
We walk through the finished work with you, close out any outstanding items and explain how the warranty works once you have moved back in.
Prefer to call? (416) 876-1052 · Mon–Fri 9–5, Sat 10–4