If you need more room in Leslieville, compare a better layout within the existing house with extending it. Start with the rooms you need and how much outdoor space you want to keep.
Explore renovation servicesRequest your consultation

Look at how the kitchen, entry and living room share the main floor. Compare opening up that layout with extending the house into the yard.

Plan pantry storage, counters and seating around the daily route to the backyard. In a narrow room, check how your layout handles traffic during meal prep.

Compare what fits in the existing bathroom with the space you would gain by moving a wall. Check plumbing routes before planning a larger shower or vanity.

Check headroom, moisture and the stair layout before planning a finished lower level. Include space for laundry and utility access in the first sketch.
Much of Leslieville was built in the late 1800s as modest workers’ cottages, Victorian semis and row houses, with newer infill mixed in. The lots are often narrow and the houses often share walls, so structure, access and neighbours need attention before design is set.
We work through these items with you and your design team during pre-construction, so the drawings, budget and schedule reflect them from the start.
Start with bottlenecks in the kitchen, bath or entry. Keeping plumbing in roughly the same location may make sense if a better fixture layout or more storage will solve the problem.

Compare how each footprint changes the yard, daylight in the existing rooms and access beside the house. Check lot dimensions and how the new structure would connect before committing to a plan.
Many older Leslieville basements have limited ceiling height. Finishing the space as it is costs less disruption, but headroom stays what it is. Underpinning lowers the floor and deepens the foundation, which brings structural work, shoring, drainage and, in a semi or row house, coordination with the neighbouring wall. Compare both against how you plan to use the space. Garden or laneway suites are a separate option where a lot has the access and zoning for one.
Most decisions about cost, approvals and schedule are made before construction starts. In Leslieville that includes shared walls, how the site will be accessed and what the engineer finds in the existing structure.
We review the house, the lot and what you want to change, then work through drawings, approvals, selections and a detailed quote. Any change is priced in writing and approved by you before the work starts.
We coordinate trades, inspections and deliveries, protect the parts of the house and property that stay, and keep you informed about progress, upcoming decisions and anything that affects the schedule.
We walk through the finished work with you, close out any outstanding items and explain how the warranty works once you have moved back in.
Prefer to call? (416) 876-1052 · Mon–Fri 9–5, Sat 10–4