
How Much Does a Condo Renovation Cost in Toronto?
Real 2026 pricing for condo bathroom, kitchen, and full-unit renovations — from $18K bath refreshes to $80K+ custom kitchens. Board approvals, $2M+ insurance, and WSIB certification are built into how we quote. Start with our full condo renovation service overview.
50+ Projects · 4.9-Star Google Rating · WSIB Certified · Fixed Pricing

Condo Renovation Cost in Toronto — At a Glance
Compare scopes below. Condo work adds board approval and building logistics — your fixed-price quote documents both. See condo bathroom and condo kitchen service pages for process detail.
Condo Bathroom Refresh
$18,000 – $30,000
2–3 weeks build
- Fixture and finish upgrade in existing layout
- Vanity, toilet, tub or shower surround
- Tile and lighting refresh
- No plumbing relocation
- Board submission support included
Condo Kitchen Renovation
$20,000 – $55,000
3–5 weeks build
- Cabinetry and countertop replacement
- Appliance integration
- Backsplash and electrical updates
- Often without plumbing relocation
- Elevator booking and disposal coordinated
Luxury Condo Remodel
$55,000 – $80,000+
4–8 weeks build
- Full bath and/or kitchen with premium finishes
- Custom millwork and stone
- Layout changes with stack coordination
- Open-concept or full-unit scope
- Board, permits, and inspections managed
Full-unit renovations vary by square footage and structural scope. Your in-unit consultation produces a line-by-line fixed-price quote — no estimates. No surprises.
What's Included in the Fixed-Price Quote
Included
- Design consultation and material selection
- Demolition and disposal (building-compliant)
- Board package preparation and submission support
- Plumbing and electrical to code
- Cabinetry, countertops, and finishes (allocation-based)
- Elevator booking and hallway protection
- Project management through handover
- Final walkthrough and warranty documentation
Not Included Until You Confirm Scope
- Appliances (we install; you supply or use trade pricing)
- Plumbing stack moves requiring engineering (quoted separately)
- Condo corporation fees or damage deposits
- Permit fees (passed through at City rates when required)
What Changes Your Condo Renovation Cost
High-rise logistics and board timelines affect condo budgets as much as finishes. We document both in your quote.
Board approval timeline
Most Toronto condo boards need 4–10 weeks to review insurance, scope, and schedules before work starts. We prepare submissions and build approval time into your project plan from day one.
Plumbing and stack constraints
Keeping fixtures in place reduces cost. Moving a toilet, shower, or kitchen sink may require stack coordination with building management and licensed plumbers — we handle that when layout changes are in scope.
Material selection
Stock cabinetry and quartz countertops sit in a lower tier than custom millwork and natural stone. Your quote uses defined allocations so upgrades are transparent before you sign.
Building access and noise rules
Elevator bookings, working-hour limits, and private waste disposal are standard in Yorkville, Midtown, and Harbourfront towers. These logistics are included in our service — not added as surprise line items mid-project.
How Our Fixed-Price Quote Works
Four steps from first visit to a documented price.
Week 0
Free consultation
We visit your unit, review the space, discuss goals, and outline board and permit needs. No cost, no obligation.
Weeks 1–3
Design & quote
Scope, materials, board package, and a fixed-price line-item quote. Lead times and approval windows confirmed.
Weeks 4–10
Contract & build
After board approval, demolition and trades proceed on milestone payments with noise and access rules respected.
Final week
Handover
Final walkthrough, warranty documentation, and punch-list completion.
Sample Quote Breakdown
Illustrative line items for a mid-range condo kitchen renovation. Your quote may differ by building rules and layout.
| Line item | Allocation |
|---|---|
| Demolition & disposal | $2,000 |
| Board package & building coordination | $1,500 |
| Electrical updates | $4,500 |
| Plumbing (in-place layout) | $3,500 |
| Cabinetry (allocation) | $18,000 |
| Countertops (quartz allocation) | $5,500 |
| Backsplash & finishing | $2,500 |
| Project management | $5,500 |
| Cleanup & final walkthrough | $500 |
| Sample total | $45,000 |
Compare Other Renovation Costs in Toronto
Explore house and condo cost pages for side-by-side context.
Detailed Cost Resources
Long-form guides from our blog — same fixed-pricing mindset as this page.
Prefer email first? Use the form below — include your preferred contact method and building name in your project notes.
Get Your Fixed-price Condo Quote
Free consultation · Fixed-price quote after the visit · No obligation
Your information stays private. See our Privacy Policy.
What happens next
- We review your project details
- Anna calls to schedule a visit
- You receive a fixed-price quote
Anna MercerClient Journey Specialist




